Project Details:
The site is located off Westbrook Close, Chapel-en-le-Frith alongside the existing Watercourse. The Banking areas followed the Watercourse through an existing Parkland area.
The work comprised the installation of Willow Spiling along a stretch of banking 10m long and including backfilling and grading of the adjacent banking.
All material was double handled from the existing Compound area, through the existing densely populated estate using dumpers and a Bankman.